Abu Dhabi AI Compute Campus
10 MW
PHASE 1 IN DEVELOPMENTA phased AI compute campus on more than 90,000 m² of industrial land in western Abu Dhabi. Approved utility power of 60 MW is developed as an initial 10 MW phase followed by a further 50 MW. Phase 1 is planned as 256 GPU servers delivered in four 64-server units, built from prefabricated modules with custom liquid cooling and separate heat rejection, and operated as dedicated capacity for identified customers.
- POWER
- 10 MW initial phase · 60 MW approved
- LAND
- More than 90,000 m²
- COMPUTE
- 256 GPU servers · 2,048 GPUs · four 64-server units
- CONSTRUCTION
- Prefabricated data centre modules, one server per liquid-cooled cabinet
- COOLING
- Closed-loop liquid cooling with dry heat rejection, designed for 50 °C ambient
- PILOTS
- Solar canopy for auxiliary loads · satellite backup connectivity
Developer and operator: land and power application, facility development, modular construction coordination, commissioning and campus operations.